Base is finally done,look to the left and right and can see trex now on the ground.You can see by the backfill the left to right slope,and the front to back slope.
Next I will put up 4x4's for the door and to support the Ridgepole.Will probably dig the holes tomorrow and think about it,I want at least 40 inches on the opening so I can get the IBC Totes that will be the fishponds in.Need to think out what I will do on the doorway.
Left side
Right side,thats a shadow,no gaps between boards
So what I learned is PROOF there is a Heaven and Hell.In Hell they make you build greenhouse bases.The worse you are,the more slope you get.
Also you dont need to waterboard suspects.Just put them on 1000 acres of slope.Make them build greenhouses,they will crack in a week.